Whilst Nick is using the digger I am able to get on inside and have decided to take off the rest of the old plaster, some of it has been badly damaged by water penetration and salts over the years and some is only just holding on to the walls and could have fallen off with a gusty breeze through the window, luckily the windows are all stuck shut and don't budge! This in and out as required to help with pipes or levels or adding shingle etc. has allowed us both to make great progress. Most of the plaster is off the walls in the Kitchen, only the electric board and sink areas are left, the drains are in place and all signed off by Building control, who also looked at and signed off the insulation we added some weeks back in the roof space, so that is great news as having to re-do any of that would have been horrendous. So well done Nick for a great job and I'm also happy to say his expectant cow had a bull calf on Thursday night too, congratulations all round! A big tidy up and floor lifting next week!
0 Comments
Leave a Reply. |
AuthorJan and Pete, retiring Headteachers with a dream. Archives
November 2018
Categories |