After the yellow plastic radon barrier and iron mesh the first section of the stable floor has gone down. A new conduit for a permanent water pipe was also connected under the chapel wall. The ring beam has been poured around the top of the wall. This forms lintels across the doors and window openings and provides a solid base for the roof to sit on.
2 Comments
Mum
20/3/2017 10:49:39 pm
Thanks for the blog. You have certainly progressed since we were down. Can't see the last windows Dave has put in. .Say thanks to him from me for helping out with thing he's a great bloke to have as a friend. Great photo of Sarah &Jan.
Reply
Pete Fleming
20/3/2017 10:58:17 pm
thanks mum, glad you are keeping up with the progress. see you April, love Pete and Jan
Reply
Leave a Reply. |
AuthorJan and Pete, retiring Headteachers with a dream. Archives
November 2018
Categories |