The outcome of Peters visit is as follows.
Three new sleeper walls need to be build as none of the originals will do. These will be of 300mm deep concrete mix c20 strength. The two by the walls being 450mm wide and the centre one being 600mm. More air bricks to be added where possible. In the kitchen area, the same three walls to be built and the wet here is quite common so not to worry, could put in a sump drain. All new beams to be on a dpc layer and he will try to get me the drawings in about a week. Lowering the outside areas will help!