The steps to the veggie patch are now in place! Chris has made a great job of it all and has begun to dig over the soil ready for the turf to be laid. It will need to be rollered first. I have laid the plastic inside the building ready for the underfloor heating pipes to go down and Dave and the gang are going great guns on the roof.
0 Comments
Leave a Reply. |
AuthorJan and Pete, retiring Headteachers with a dream. Archives
November 2018
Categories |